Jurmalas Udens Ltd
2009

Jurmala Water Ltd.
ww.jurmalasudens.iv
Promendes iela la, Jrmala, LV-2015 Tlr.: +371 67811362 Fakss: +371 67811376 E-pasts: jurmalas@udens.com
Jurmala, 2009. gada 3. februris Nr. 4- 11/3

Response
Olimps Ltd.",along with ,,0.A.S. bve", formed structure of participants, with full responsibility, from 24th April 2007 to 29th of February of 2008, in scope of ptoject Development of water supply system in Jurmala,( pact Nr.: 2001/LV/16/P/PE/008), in scope of contract following works were done: Extension and restoration of water supply system in Jurmala (contract Nr.: 2001/LV/16/P/PE/008-4):
1. Reconstruction of iron removal station ( power -360 m3/h.) providing maximum power of 8000 m3/24-hours, and reconstruction of water tower ( tanks volume 800 m3) on Dzintari str.Promenades 1A
2. Reconstruction of iron removal station ( power -360 m3/h.) providing maximum power of 8000 m3/24-hours , and construction of re-lift pumping plant (power - 360 m3/h.) with tanks (V=2000 m3).Jaundubulti , str. Lielupe 24.replacement of 12deep-well pumps;
3. Reconstruction of existing water tower ( tanks volume 300 m3) in Kemeri;
4. Reconstruction of existing pump station in sewerage system (power 300 m3/h) Jurmala, str. Upesleya 7;
5. Reconstruction of existing pump station in sewerage system (power- 200 m3/h.) Jurmala, str. Apes 27;
6. Reconstruction of existing pump station in sewerage (power - 60 m3/st) Kemeri, str. Seravotu 18; 7. Construction of brand new pump station in sewerage (power - 60 m3/h.), Jaunkemeri;
8. Conection of Kemeris waste-water treatment to Jaunkemeris facilities, including construction of new water towers (DU 280) and main gravity conduit (DU 400); 9. Prolongation and reconstruction main sewerage network: - Overall length of water pipeline - 9083 m; - Overall length sewer(age) system - 2640 m; - Overall length of confined water - 3566 m.
All above-listed works have been completed in correspondence with project scheme, and in agreement with contract, time constrains and quality.

President of Jurmala Water Ltd. V. Antonovs