Main
Intranet
News About company Services Works
Main olimps@olimps.lv Site map
Works
Design
AS Latvijas Gze
Published: 10.02.2020

Designers supervision of the repair works of High Pressure (P-6) above-ground gas pipeline DN 700 mm , average pressure (P <4 bar) above-ground gas pipeline DN 250 mm and DN 150 mm in Riga "(RE-0002-14 (4 )) "