Works completed:
- 110/10 kV power substation No.32 «Gajoks» (Daugavpils) – 10 kV switchgear unit design development, 110 kV switchgear design development;
- 110/6 kV power substation No.61 «Liepaja» – 6 kV switchgear unit design development;
- Power substation TP-901 reconstruction design development;
- 110 kV power substations «Marupe» relay protection and automation system site adjustment and start-up;
- Kegums hydroelectric power station (HPS) fire alarm system design development;
- Daugavas HPS (Kegums HPS, Plavinas HPS, Riga’s HPS) general control (SCADA system) centre development concept.