Power generation and distribution
Construction of combined heat and power plant (Brivibas street 401, Riga), power output: 12 MW, heat output: approx.50 MW.
Works completed:
- Consultations;
- Design for plant power generation facilities connection to Latvenergo grid;
- Power equipment procurement, installation and start-up;
- Design author’s supervision