Karelsky Okatysh Jsc. Severstal Jsc
Ore mining and processing enterprise handling more than 10.3 mio tonnes of iron ore annually.
Facilities and components:
- Dark oil discharge railway rack (1х16 tank cars);
- Recirculating mazut discharge system (2 heating units);
- Fuel storage (3 vertical steel tanks х 10 000 m3);
- Tank heating system applying thermal oil as heating agent (VST 4х10 000 m3, VST 3х2000m3);
- Diesel fuel pump of POL storage unit;
- Tail thickening unit (waste left after ore enrichment) and transportation to tailing dump (unthickened waste transportation capacity 16000 m3/h).
Scope of work:
- Consultations, concept design;
- Design documentation for all design project stages;
- Supervision;
- Automated process control system (APCS) development;
- Procurement of APCS equipment;
- APCS setting and commissioning.