Ust-Luga oil storage base, Baltic Pipeline System-2

Terms:

2009 – 2012

Customer:

MN Druzhba (Transneft Jsc, Russia), Ust-Luga design and engineering company


ЕРС contract.

Construction of oil storage and transshipment terminal in Ust-Luga seaport – the destination of BTS-2 pipeline system, handling 30 mio tonnes annually (with potential expansion up to 38 mio tonnes)

Facilities and components:

  • Tank farm 420 000 m3 (50 000 m3 – 8 pcs., floating roof; 10 000 m3 – 2 pcs., fixed roof);
  • Process pipelines DN500-DN1200, more than 5 km;
  • Pump station (8 pumps 4000 m3/h, 120 m head);
  • Oil metering station (4 units, 12 000 m3/h capacity);
  • Boiler house (4 MWth);
  • Utilities: water supply, sewerage, power supply, communications, alarm system e.t.c.;
  • Fire prevention system and fire-fighting pump station (2 water tanks x 3000 m3);
  • Treatment facilities;
  • Office and auxiliary buildings.

Scope of work:

  • Design of office an auxiliary buildings;
  • Supervision;
  • Project management;
  • Equipment procurement ;
  • Construction management (26 subcontractors, more than  1800 construction workers including 150 engineers, 350 units of construction machinery);
  • EPC for process control systems;
  • EPC power supply solutions;
  • Commissioning;
  • Service support.