Oil and oil products transportation pipeline (LatRosTrans)

Terms:

1994 – ongoing

Customer:

LatRosTrans Jsc


Complete re-equipment and upgrading of oil and diesel fuel transportation facilities servicing grid pipeline from Belarus border to Ventspils. Pipeline with  annual throughput capacity up to 8 million  tonnes.

Facilities and components:

  • Total length of grid pipelines = 780 km (in Latvia only);
  • Four pump stations : «Skrudaliena 1, 2», «Ilukste», «Dzukste»;
  • Three oil and diesel fuel metering units;
  • Tank farm, total volume 160 000 m3;
  • Oil products unloading rack.

Scope of work:

  • Consultations, elaboration of concept design;
  • Elaboration of all stages of design project;
  • Equipment procurement;
  • Supervision;
  • Monitoring of implementation of construction and installation works;
  • Development and procurement of automated  process control systems;
  • Comprehensive commissioning.