Rosneft export terminal, Tuapse, Russia
Reconstruction and expansion of oil loading, storage and transshipment terminal from 6 to 17 mio tones per year. Total tank farm volume 400 000 m3;
Facilities and components:
- Pump stations;
- Tank farm with a total volume of 400 000 m3 ;
- 3 oil discharge railway racks;
- Jetties;
- New deep-water channel;
- Thermal oil heating room;
- Treatment facilities;
- Fire-fighting system.
Scope of work:
- Consultations, concept design;
- Design all stages;
- Equipment procurement;
- Supervision;
- Control of implementation of construction, installation and commissioning;
- Development and procurement of process automation systems;
- Comprehensive commissioning.