Ust-Luga oil storage base, Baltic Pipeline System-2
ЕРС contract.
Construction of oil storage and transshipment terminal in Ust-Luga seaport – the destination of BTS-2 pipeline system, handling 30 mio tonnes annually (with potential expansion up to 38 mio tonnes)
Facilities and components:
- Tank farm 420 000 m3 (50 000 m3 – 8 pcs., floating roof; 10 000 m3 – 2 pcs., fixed roof);
 - Process pipelines DN500-DN1200, more than 5 km;
 - Pump station (8 pumps 4000 m3/h, 120 m head);
 - Oil metering station (4 units, 12 000 m3/h capacity);
 - Boiler house (4 MWth);
 - Utilities: water supply, sewerage, power supply, communications, alarm system e.t.c.;
 - Fire prevention system and fire-fighting pump station (2 water tanks x 3000 m3);
 - Treatment facilities;
 - Office and auxiliary buildings.
 
Scope of work:
- Design of office an auxiliary buildings;
 - Supervision;
 - Project management;
 - Equipment procurement ;
 - Construction management (26 subcontractors, more than 1800 construction workers including 150 engineers, 350 units of construction machinery);
 - EPC for process control systems;
 - EPC power supply solutions;
 - Commissioning;
 - Service support.
 

